Intra-PJM Tariffs --> OPEN ACCESS TRANSMISSION TARIFF --> OATT VI. ADMINISTRATION AND STUDY OF NEW SERVICE REQUESTS; R --> OATT ATTACHMENT DD --> OATT ATTACHMENT DD.15. COORDINATION WITH ECONOMIC PLANNING P

15.COORDINATION WITH ECONOMIC PLANNING PROCESS

 

Prior to the posting of the planning parameters for each Base Residual Auction, if the Office of the Interconnection determines that the Capacity Emergency Transfer Limit is less than 1.15 times the Capacity Emergency Transfer Objective for any LDA, the Office of the Interconnection will include a transmission upgrade in the RTEP as soon as practicable, if all of the following criteria is satisfied:

 

 

 

 

 

The annual costs of such upgrade shall be allocated as specified in Tariff, Schedule 12.

 

The Office of the Interconnection shall include in its planning period parameters report, posted on its website in February of each year, the following information for the transmission upgrades it identifies to address easily resolvable constraints under this section 15, if any: (1) a description of each easily resolvable constraint; (2) the limiting transmission elements responsible for each such easily resolvable constraint; (3) an explanation of why the transmission elements responsible for each such easily resolvable constraint identified are limiting; (4) a list of the easily resolvable constraint transmission upgrades undertaken as well as the cost, location, and the entity(ies) undertaking each such upgrade; and (5) the impact of these projects on that Delivery Year's planning parameters.

 

Following each Base Residual Auction, the Office of the Interconnection shall review each LDA that has a Locational Price Adder to determine if Planned Generation Capacity Resources, Planned Demand Resources, or Qualifying Transmission Upgrades submitted Sell Offers that cleared in such auction.  If a Locational Price Adder results from the clearing of an LDA for two consecutive Base Residual Auctions, and no such planned resources or upgrades clear in such auctions for such LDA, then the Office of the Interconnection shall evaluate in the RTEP process the costs and benefits of a transmission upgrade that would reduce to zero the Locational Price Adder for such LDA.

Effective Date: 12/21/2020 - Docket #: ER21-162-000 - Page 1

OATT > VI. ADMINISTRATION AND STUDY OF NEW SERVICE REQUESTS; R > ATTACHMENT DD > ATTACHMENT DD.15. COORDINATION WITH ECONOMIC PLANNING P
Associated Filings
Associated Orders